Searching the best new exam braindumps which can guarantee you 100% pass rate, you don't need to run about busily by, our latest pass guide materials will be here waiting for you. With our new exam braindumps, you will pass exam surely.

View All C_S43_2022 Actual Exam Questions, Answers and Explanations for Free [Q41-Q56]

Share

View All C_S43_2022 Actual Exam Questions, Answers and Explanations for Free

C_S43_2022 Exam Free Practice Test with100% Accurate Answers


SAP C_S43_2022 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Preventative Maintenance: This section of the exam covers describing options related to preventive maintenance using task lists, single-cycle, and time-based strategies.
Topic 2
  • Maintenance Processing of Advanced Functions: This section covers the implementation of corrective maintenance by utilizing conventional and FIORI-based apps.
Topic 3
  • Maintenance Processing of Basic Functions: This section of the exam covers how to describe and execute the process of breakdown maintenance by utilizing conventional and FIORI tools.
Topic 4
  • Organizational Units and Master Data: In this section of the exam, the candidates are tested for implementing the vital organizational units related to the integration into general logistics as well as accounting.
Topic 5
  • Technical Objects: This section of the exam covers the description and implementation of technical asset structures following fundamental concepts.

 

NEW QUESTION # 41
What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question

  • A. Maintain a serial number for an existing equipment master.
  • B. Assign a serial number profile to the equipment category
  • C. Add a serialized material to the equipment serial data view.
  • D. Assign a serial number profile to an additional business view for equipment category
  • E. Assign a serial number profile to the related material master.

Answer: A,B,E

Explanation:
Serializing a piece of equipment means assigning a unique serial number to identify and track the equipment throughout its lifecycle. The prerequisites for serializing a piece of equipment are:
Assign a serial number profile to the equipment category. This defines the rules for creating and managing serial numbers for the equipment, such as the number range, the check digit, and the serial number usage. The serial number profile is assigned in the Customizing activity Define Equipment Categories under Plant Maintenance and Customer Service -> Master Data in Plant Maintenance and Customer Service -> Technical Objects -> Equipment -> Equipment Categories.
Assign a serial number profile to the related material master. This ensures that the material and the equipment have the same serial number profile and that the serial number is automatically copied from the material to the equipment. The serial number profile is assigned in the material master data in the Plant Data/Stor. 1 view under Serial Number Profile.
Maintain a serial number for an existing equipment master. This can be done either manually or automatically. Manually, you can enter the serial number in the equipment master data in the Serial Data view under Serial Number. Automatically, you can link the equipment with a serialized material and the serial number will be copied from the material to the equipment. This linking can be done either with a goods movement or manually.
The options that are not prerequisites for serializing a piece of equipment are:
Add a serialized material to the equipment serial data view. This is not a prerequisite, but rather a possible way to link the equipment with a serialized material and copy the serial number from the material to the equipment. However, this can only be done if the serial number profile is already assigned to both the equipment category and the material master.
Assign a serial number profile to an additional business view for equipment category. This is not a valid option, as the serial number profile is assigned to the equipment category itself, not to any additional business view.
Reference:
Serial Number Management
Explaining Refurbishment of Spare Parts


NEW QUESTION # 42
Which views can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question?

  • A. Warranty
  • B. Configuration
  • C. Manufacturer data
  • D. Serial data

Answer: A,C

Explanation:
An equipment category defines the technical characteristics of an equipment and the views that are available for it. A view profile is a set of views that can be assigned to an equipment category. The views that can be assigned to an equipment category via a view profile are:
Basic data
Classification
Location
Organization
Partner
Status
Structure
Warranty
Manufacturer data
Measurement document
History
Permits
Documents
User fields
Serial data
Configuration
Object links
Time-dependent data
Linear data
Geographical data
Maintenance plan
Maintenance item
Maintenance task list
Maintenance order
Maintenance notification
Service order
Service notification
Service contract
Service confirmation
Service quotation
Service request
Service plan
Service item
Service task list
Service product
Service product allocation
Service product structure
Service product location
Service product partner
Service product status
Service product classification
Service product documents
Service product permits
Service product user fields
Service product serial data
Service product configuration
Service product object links
Service product time-dependent data
Service product linear data
Service product geographical data
Among these views, the ones that match the options given in the question are Warranty and Manufacturer data. Therefore, the correct answers are A and D.
References:
SAP Help Portal - Equipment Category
SAP Help Portal - View Profile


NEW QUESTION # 43
What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.

  • A. The planner can change planned costs at the operation level
  • B. The assignment of the notification to the maintenance order header cannot be deleted.
  • C. Goods receipts for external services can be entered.
  • D. The controller can determine actual cost surcharges.
  • E. The planner can change estimated costs only at the header level

Answer: A,C,D


NEW QUESTION # 44
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question

  • A. Via activity type and hourly rate
  • B. Via cost center and activity type
  • C. Via cost center assigned to a personnel number
  • D. Via organizational unit and personal hourly rate

Answer: A,B


NEW QUESTION # 45
You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?

  • A. Scheduling period
  • B. End Date for Scheduling
  • C. Scheduling indicator
  • D. Call horizon

Answer: A

Explanation:
Explanation
To have several plan dates calculated in a maintenance plan, you use the scheduling period parameter. The scheduling period defines the time interval for which the system calculates the planned dates for the maintenance plan. For example, if you enter 12 months as the scheduling period, the system calculates the planned dates for the next 12 months from the current date. Youcan also specify the end date for scheduling, which is the last date for which the system calculates the planned dates. The scheduling indicator determines how the system calculates the planned dates based on the cycle, the shift factor, and the tolerance. The call horizon defines the percentage of the cycle that must be expired before the system generates a call object (such as a maintenance order or notification) for the planned date.
References: 1: Scheduling Maintenance Plans - SAP Learning 2: Maintenance Plan Scheduling Parameters - SAP Online Help


NEW QUESTION # 46
What can be determined using the offset within a maintenance strategy? Note: There are 2 correct answers to this question.

  • A. The first due date of a maintenance package
  • B. A one-time shift of a maintenance package
  • C. The call date for the maintenance order
  • D. A preliminary buffer shifting the reference date of the maintenance order

Answer: A

Explanation:
Explanation
The offset within a maintenance strategy is a parameter that allows you to adjust the due dates of the maintenance packages in a maintenance plan.The offset can be used for two purposes:
To determine the first due date of a maintenance package. For example, if you have a quarterly maintenance package with an offset of 2 months, the first due date will be 2 months after the start date of the maintenance plan, and the subsequent due dates will be every 3 months after that.
To shift a maintenance package by a one-time amount. For example, if you have a monthly maintenance package with an offset of 10 days, the first due date will be 10 days after the start date of the maintenance plan, and the subsequent due dates will be every month after that. However, if you want to shift the second due date by 5 days, you can enter an offset of 5 days for the second maintenance package, and the due date will be 5 days later than the normal cycle. The offset will only apply to the second maintenance package, and the subsequent due dates will follow the normal cycle. The offset does not affect the call date for the maintenance order, which is determined by the call horizon and the scheduling period. The offset also does not create a preliminary buffer shifting the reference date of the maintenance order, which is determined by the lead float and the tolerance. References: 1: SAP Help Portal, SAP S/4HANA Asset Management, Learning Journey: SAP S/4HANA Asset Management, Topic: Maintenance Planning, Subtopic: Maintenance Strategy2: SAP Community, Maintenance Strategy-offset and float in days3: SAP Blogs, Highlights for Asset Management in SAP S/4HANA
2021, Topic: Maintenance Planning.


NEW QUESTION # 47
In which maintenance object can you use an activity type? Note: There are 2 correct answers to this question.

  • A. Work center
  • B. Notification activity
  • C. Maintenance order operation
  • D. Maintenance order header

Answer: C,D

Explanation:
Maintenance activity type is a key for the type of maintenance activity provided, such as repairs, shutdowns, regular activities, inspections, and so on. It is used to classify data according to the type of maintenance activity in cost evaluations, for example, total costs or number of orders for each technical object1.
Maintenance activity type can be used in the maintenance order header and the maintenance order operation. In the maintenance order header, it is used to specify the overall type of maintenance activity for the order. In the maintenance order operation, it is used to specify the type of maintenance activity for each operation within the order. The maintenance activity type in the operation can be different from the one in the header2.
Maintenance activity type cannot be used in the notification activity or the work center. Notification activity is a key for the type of activity performed in response to a notification, such as inspection, repair, or preventive maintenance. It is not related to the maintenance activity type. Work center is a key for the location where an operation is performed, such as a workshop, a laboratory, or a machine. It is also not related to the maintenance activity type.
References: 1: maintenance activity type (PM) (SAP Library - Glossary) 2: maintenance activity type in SAP - Everything you need to know : notification activity (PM) (SAP Library - Glossary) : work center (SAP Library - Glossary)


NEW QUESTION # 48
What do you have to consider when setting up phase-based maintenance?

  • A. It is mandatory for breakdown and preventive maintenance.
  • B. It can be used with any existing order type.
  • C. It comes preconfigured when using the relevant Best Practices scope items.
  • D. It is not possible to configure the nine delivered phases.

Answer: C


NEW QUESTION # 49
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question?

  • A. Display approved purchase requisitions for which purchase orders have been generated.
  • B. Analyze confirmed maintenance orders that have NOT been settled.
  • C. Display approved purchase requisitions for which NO purchase orders have been generated
  • D. Analyze maintenance orders that are still in planning and have NOT been released.
  • E. Analyze overdue maintenance orders that have NOT been finally confirmed

Answer: C,D,E

Explanation:
Explanation
The Maintenance Planning Overview app allows the planner to analyze critical factors in a chosen reference period, such as outstanding notifications, maintenance orders, purchase requisitions, and purchase orders. The app displays the data in multiple cards that show the number of objects and their status. The planner can use the default filters or adapt them according to their needs.
The activities that the planner can perform by using the app with the default filters are:
Display approved purchase requisitions for which NO purchase orders have been generated. This is shown in the card "Purchase Requisitions Not Released" which displays the number of purchase requisitions that have been approved but not converted into purchase orders. The planner can navigate to the list of purchase requisitions and take further actions, such as creating purchase orders or changing the requirement date.
Analyze overdue maintenance orders that have NOT been finally confirmed. This is shown in the card
"Overdue Orders" which displays the number of maintenance orders that have been released but not completed within the planned end date. The planner can navigate to the list of overdue orders and check the status of the operations, confirmations, and goods movements.
Analyze maintenance orders that are still in planning and have NOT been released. This is shown in the card "Orders in Planning" which displays the number of maintenance orders that have not been released for execution. The planner can navigate to the list of orders in planning and complete the planning activities, such as assigning task lists, materials, and resources.
The activities that the planner cannot perform by using the app with the default filters are:
Display approved purchase requisitions for which purchase orders have been generated. This is not shown in any of the cards in the app. The planner can use the app "Manage Purchase Requisitions" to display this information.
Analyze confirmed maintenance orders that have NOT been settled. This is not shown in any of the cards in the app. The planner can use the app "Maintenance Order Costs Analysis" to display this information.
References:
SAP S/4HANA : New app in Plant Maintenance (Asset Management) - Maintenance Planning Overview Highlights for Asset Management in SAP S/4HANA 2021 Maintenance Management | SAP Help Portal


NEW QUESTION # 50
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note:
There are 2 correct answers to this question.

  • A. SAP Quick Viewer
  • B. Plant Maintenance Information Systems (PMIS)
  • C. SAP Lumira
  • D. SAP Crystal Reports

Answer: C,D

Explanation:
Explanation
SAP BusinessObjects Business Intelligence is a suite of products that provides data reporting, visualization, and sharing capabilities. The current portfolio of SAP BusinessObjects Business Intelligence includes the following functionalities1:
SAP Crystal Reports: A tool for creating pixel-perfect reports from various data sources, such as relational databases, OLAP cubes, XML files, and SAP applications. SAP Crystal Reports allows users to design, format, and distribute reports in various formats, such as PDF, HTML, Excel, and Word.
SAP Lumira: A tool for creating interactive data visualizations, such as charts, maps, infographics, and stories. SAP Lumira allows users to explore, analyze, and share data insights using a drag-and-drop interface and a variety of data sources, such as spreadsheets, databases, SAP applications, and SAP HANA.
SAP BusinessObjects Web Intelligence: A tool for creating ad hoc queries and reports from various data sources, such as relational databases, OLAP cubes, SAP applications, and SAP HANA. SAP BusinessObjects Web Intelligence allows users to access, analyze, and share data insights using a web browser or a mobile device.
SAP BusinessObjects Analysis: A tool for performing multidimensional data analysis and creating analytical applications from various data sources, such as OLAP cubes, SAP applications, and SAP HANA. SAP BusinessObjects Analysis allows users to slice and dice data, create calculations and formulas, and build interactive dashboards and presentations.
SAP BusinessObjects Design Studio: A tool for creating professional data visualizations and applications for desktop and mobile devices. SAP BusinessObjects Design Studio allows users to design, develop, and deploy applications using a graphical interface and a scripting language. The applications can be embedded in SAP portals, SAP BusinessObjects BI Launchpad, or SAP Fiori launchpad.
SAP BusinessObjects Dashboards: A tool for creating interactive dashboards and scorecards from various data sources, such as spreadsheets, databases, SAP applications, and SAP HANA. SAP BusinessObjects Dashboards allows users to visualize key performance indicators, trends, and alerts using a variety of components, such as charts, gauges, maps, and selectors.
Plant Maintenance Information Systems (PMIS) and SAP Quick Viewer are not part of the current portfolio of SAP BusinessObjects Business Intelligence. PMIS is a component of SAP S/4HANA Asset Management that provides standard reports and analysis tools for plant maintenance processes2. SAP Quick Viewer is a tool for creating simple reports from SAP tables and views without any programming3. References: 1: SAP Help Portal, SAP BusinessObjects Business Intelligence Platform - SAP Online Help, Topic: SAP BusinessObjects Business Intelligence suite Features2: SAP Help Portal, SAP S/4HANA Asset Management, Learning Journey: SAP S/4HANA Asset Management, Topic: Plant Maintenance Information System3: SAP Community, SAP Quick Viewer.


NEW QUESTION # 51
How does a maintenance request within the phase-based process differ from a maintenance notification in the standard process?

  • A. It always uses the risk-based assessment for prioritization.
  • B. It is mandatory to assign a task list to the maintenance request.
  • C. It is a new business object with no connection to a maintenance notification.
  • D. It contains an additional screening phase where requests can be accepted or rejected.

Answer: D


NEW QUESTION # 52
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question

  • A. Edit classification data and characteristics.
  • B. Assign documents
  • C. Create a task list for functional location
  • D. Assign a subordinate piece of equipment.
  • E. Change a reference location.

Answer: A,B,E

Explanation:
The SAP Fiori app "Create Technical Object" allows you to create a new functional location and perform the following actions:
Edit classification data and characteristics. You can assign a class to the functional location and enter values for the characteristics of the class. This helps you to categorize and search for functional locations based on their attributes1 Assign documents. You can attach documents to the functional location, such as drawings, manuals, or certificates. This helps you to provide additional information and documentation for the functional location1 Assign a subordinate piece of equipment. You can assign an existing piece of equipment as a subordinate object to the functional location. This helps you to establish a hierarchical structure of technical objects and show the relationship between them1 The SAP Fiori app "Create Technical Object" does not allow you to perform the following actions:
Create a task list for functional location. You cannot create a task list for the functional location using this app. You need to use a different app, such as "Manage Task Lists", to create and maintain task lists for technical objects2 Change a reference location. You cannot change the reference location of the functional location using this app. You need to use a different app, such as "Change Functional Location", to modify the reference location of an existing functional location3


NEW QUESTION # 53
What do you have to consider regarding a cross-plant planning scenario?

  • A. Multiple planning plants are assigned to a maintenance plant (m: 1).
  • B. Multiple maintenance plants are assigned to a planning plant (n: 1).
  • C. Only a maximum number of five maintenance plants can be assigned to a planning plant.
  • D. It is only possible within the same company code.

Answer: A,B

Explanation:
Explanation
A cross-plant planning scenario is a special planning process that allows you to carry out material requirements planning for various plants centrally. This facilitates the production of a product in another plant and it also guarantees a smooth flow of materials between different plants. In a cross-plant planning scenario, you can assign multiple maintenance plants to a planning plant (n: 1) or multiple planning plants to a maintenance plant (m: 1). This means that you can plan and execute maintenance orders in different plants using a common planning plant or a common maintenance plant. There is no limit on the number of maintenance plants that can be assigned to a planning plant, so answer B is incorrect. A cross-plant planning scenario is also possible across different company codes, as long as the plants belong to the same controlling area. Therefore, answer D is also incorrect. References: Cross-Plant Planning | SAP Help Portal and SAP S/4HANA Asset Management: Plants from a Maintenance ... - SAP PRESS


NEW QUESTION # 54
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?

  • A. Scheduling type
  • B. Call horizon
  • C. Initial/subsequent buffer
  • D. Package offset

Answer: C


NEW QUESTION # 55
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question

  • A. Estimated annual performance
  • B. Counter overflow reading
  • C. Scheduling period
  • D. Start counter reading

Answer: A,D

Explanation:
Explanation
To schedule a performance-based maintenance plan, you need to specify the start counter reading and the estimated annual performance of the equipment or functional location. The start counter reading is the initial value of the counter assigned to the maintenance plan. The estimated annual performance is the expected value of the counter for one year. These parameters are used to calculate the maintenance cycle and the due date for the maintenance plan. The scheduling period and the counter overflow reading are optional


NEW QUESTION # 56
......

C_S43_2022 dumps Free Test Engine Verified By It Certified Experts: https://passleader.dumpexams.com/C_S43_2022-vce-torrent.html